Description

Mellor & Co was tasked with carrying out the plastering works at the Crowne Plaza Hotel in Birmingham, focusing primarily on overskimming the Artex ceilings in the bedrooms, hallways, and bathrooms. The Artex presented a thick stipple finish, which posed several challenges due to its asbestos content. Despite the complexity, our team was able to overcome these obstacles and deliver a smooth, professional finish, all while navigating the logistical challenges of working in a live hotel environment.

 

Challenges

Skimming Over Thick Stippled Artex Ceilings:
One of the most significant technical challenges on this project was the nature of the Artex ceilings. The thick stippled texture could not be scraped or broken down due to the asbestos present within the material. As a result, we had to carefully skim over the entire surface, preserving the integrity of the existing Artex while ensuring a smooth finish. This required a high level of precision and expertise, as the thick stippling made it difficult to achieve an even surface. Our team had to apply a thicker skim coat than usual, making it crucial to control the consistency and finish to avoid imperfections.

Logistical Constraints of a Live Hotel:
Working within an operational hotel added another layer of complexity to the project. To minimise disruption for hotel guests and staff, we adopted a phased approach, completing the plastering works one floor at a time. This allowed the hotel to only be without one floor at any given point, ensuring they could maintain business as usual on the remaining floors. Coordinating access to specific areas, managing material deliveries, and ensuring that we worked efficiently within these constraints required precise planning and constant communication with hotel management.

Our Process:

Our team approached this project with careful preparation, ensuring that all asbestos-related safety protocols were strictly followed. We used specialised plastering techniques to handle the thick Artex, ensuring proper adhesion and a flawless finish. By working floor-by-floor, we minimized disruption and kept the project on track, even in the face of logistical hurdles.

Step-by-Step Approach:

  • Floor-by-floor scheduling to minimize guest impact.

  • Application of a thicker skim coat to cover the deep stipple of the Artex.

  • Ensuring all asbestos safety protocols were followed, with no disturbance to the material.

  • Consistent collaboration with hotel management to coordinate access and timelines.

 

Results

The outcome was a huge success. Despite the challenging Artex, our team delivered an exceptional, smooth finish on all ceilings across the bedrooms, hallways, and bathrooms. The quality of the plastering work greatly improved the aesthetic of the hotel’s interiors, contributing to a more modern, refreshed look for their guests. Feedback from the hotel was overwhelmingly positive, with special praise for our ability to complete the works while ensuring minimal disruption to their operations.

This project highlighted Mellor & Co Plastering’s ability to tackle complex technical challenges while navigating the logistical demands of working in a live environment. Working floor-by-floor allowed the hotel to remain operational throughout the project, further showcasing our flexibility and commitment to client satisfaction.

Through our work at the Crowne Plaza, we’ve demonstrated our expertise in delivering challenging, high-end plastering solutions on time despite strict logistical constraints.

 

 

Ready to discuss the requirements of your next project?

 

 